October 20, 2013

Progress at Three Weeks

Not a lot is different this week, but there have been additional supports installed on the temporary stairs at the back of Building A and the side of Building B and the emergency exit lights and sign for the back door of Building A's third floor are uncovered again.  (All photos shot on October 17th.)

BACK OF BUILDING A





SIDE OF BUILDING B


FRONT









(Looking from front landing into hallway of top floor, Building B.)